Derby
Castle
The opening
of the Manx Electric Railway has been delayed this year,
due to the demolition
of Summerland and other civil engineering works along the line.
Here Car No.22
stands outside the depot ready for a trial run prior to the line opening
for the public on the 15th May.
An Island
Images picture